Click to enhance your knowledge of the Building Regulations with our access guides!

Vaccination Unit, Tameside Hospital

ACCESS TO SUPPORT THE COVID-19 VACCINE ROLLOUT

Application
Healthcare
Location
Tameside, Manchester
System
Fully Compliant Ramp System
Service Package
Supply & Install

REQUIREMENT:

A fully compliant ramp to a temporary ward, supporting the COVID-19 vaccination programme

ADDITIONAL INFORMATION:

CAD and technical drawings were designed in-house and based on-site measurements and architectural drawings. 

END RESULT:

Once the temporary vaccination unit was assembled, we installed a Rapid Ramp compliant with Document M and K of the Building Regulations.

The ramp also overcomes the concrete steps that would have otherwise hindered wheelchair users from accessing the unit.

FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Rest Platform – a rest platform at 5 metres is required to allow the user to pause.
  • 1100mm High Rail – these handrails attach to any level sections.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.

Gallery

GET A QUICK PRICE

The more information you can provide, the quicker we can quote.

Your Details

Project Details

Additional Information

Please email all attachments to [email protected]
Remember to include the site address within the subject line for reference.

Rapid Ramps is committed to handling information you have supplied to us in compliance with the Data Protection Act. We'll never share your details and you can unsubscribe at any time. Please visit our Privacy Policy for more information.

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

Riverside Works, Church Ln, Etchingham, TN19 7AS

Hours:
8am - 5pm, Monday to Friday