Vaccination Unit, Tameside Hospital

ACCESS TO SUPPORT THE COVID-19 VACCINE ROLLOUT

Application
Healthcare
Location
Tameside, Manchester
Service Package
Supply & Install

REQUIREMENT:

A fully compliant ramp to a temporary ward, supporting the COVID-19 vaccination programme

ADDITIONAL INFORMATION:

CAD and technical drawings were designed in-house and based on-site measurements and architectural drawings. 

END RESULT:

Once the temporary vaccination unit was assembled, we installed a Rapid Ramp compliant with Document M and K of the Building Regulations.

The ramp also overcomes the concrete steps that would have otherwise hindered wheelchair users from accessing the unit.

FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Rest Platform – a rest platform at 5 metres is required to allow the user to pause.
  • 1100mm High Rail – these handrails attach to any level sections.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.

Gallery