University Technical College (UTC) Warrington

14 RAMPS AND STEPS INSTALLED IN JUST TWO WEEKS

Application
Education
Location
Owen Street, Warrington
Service Package
Hire

PROJECT BACKGROUND:

Following water ingress that affected the external façade and fixings of University Technical College (UTC) Warrington’s main six-storey building, extensive remedial works were required. Around 420 students needed to relocate to temporary modular school buildings at the former Pentagon Ford site on Owen Street.

With the temporary accommodation expected to remain in place for up to three years, safe access was essential. The new facilities also needed to be ready for students within a demanding timeframe, making the rapid installation of suitable access solutions a key part of the project.

REQUIREMENT:

Rapid Ramp was appointed to design and install modular ramps and steps blocks A, B and C, with an urgent deadline to get the temporary school facilities ready for use.

The solutions needed to accommodate high footfall, provide accessible routes for users with reduced mobility and offer convenient step access, while working around varying entrance heights and restricted space.

All systems had to meet the relevant requirements of Approved Documents M and K, with careful coordination essential to deliver the project on time and avoid delaying the school’s move into its temporary accommodation.

DESIGN PHASE:

Getting the design right was the first step. Our surveyor visited the site and used Rapid Scan technology to capture detailed measurements and information, creating an accurate 3D model of the area.

This was then passed directly to our in-house design team, who produced 2D installation plans and 3D visualisations for the project contractor to review.

The first set of drawings was sent to the contractor just five working days after the site survey was conducted – an impressive turnaround time from survey to initial design.

Examples of the 3D design visualisations, 2D installation plans and full site plan showing the proposed access solutions across blocks A, B and C.

INSTALLATION:

14 ramps and steps installed in just two weeks – an incredible achievement and a real example of teamwork in action.

Getting all 14 access solutions from initial enquiry through to installation in such a short timeframe took careful planning and close coordination.

Our in-house surveyors, designers and warehouse staff worked alongside our installation partners to keep everything moving, from gathering the initial site information and preparing the designs to getting the components ready for installation.

As the manufacturer, we already had the required components made and available in stock, meaning there was no waiting for products to be produced.

The modular design also helped speed up installation. The pre-fabricated components could be assembled quickly, with no curing or drying time needed. Once fitted and the necessary safety checks were complete, the solutions were ready for immediate use.

When the hire period comes to an end, the systems will be dismantled and the components recovered, ready for potential reuse on future projects.

SYSTEMS’ FEATURES INCLUDED:

  • Looped Trombone Ends – Curved end sections reduce the risk of clothing, bags or other items snagging on exposed rail ends.
  • Slip-Resistant Mesh Platform – A multi-directional walkway with self-draining steel mesh provides a secure walking surface whilst allowing water and debris to pass through.
  • Standard Colour: Black – Powder-coated black finish provides greater durability and weather resistance than traditional paint.
  • Adjustable Telescopic Legs – Allow the system to accommodate the varying existing ground levels and threshold heights.
  • Slip-Resistant Yellow Tread – High-visibility tread highlights key level changes and transition points.
  • Continuous Handrail - This handrail system ensures that users always have a support to hold onto.
  • Infill Handrail - This product safeguards against users climbing or falling through gaps.

HAVE A SIMILAR REQUIREMENT?

REQUEST A QUICK PRICE

Estimates can be returned within 24hrs if there is clear information given, including project address, drawings, photos and contact details.

Gallery

GET A QUICK PRICE

The more information you can provide, the quicker we can quote.

Your Information

Project Information

Additional Details

Please email all attachments to [email protected]
Remember to include the site address within the subject line for reference.

Rapid Ramps is committed to handling information you have supplied to us in compliance with the Data Protection Act. We'll never share your details and you can unsubscribe at any time. Please visit our Privacy Policy for more information.

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

Riverside Works, Church Ln, Etchingham, TN19 7AS

Hours:
8am - 5pm, Monday to Friday