Fleetbank House

AN EARLY MORNING START FOR INSTALLERS

Application
Commercial
Location
London
Service Package
Supply & Install

REQUIREMENT:

A fully DDA compliant ramp system to overcome a step to an office block. 

ADDITIONAL INFORMATION:

The client requested that preferably installation should take place before opening hours.

CAD drawings were designed by our specialist designer in-house along with a quotation.

Drawings are produced to help customers visualise how a ramp will appear in situ.
 

END RESULT:

Our expert team installed a fully compliant Rapid Ramp in the early morning before the office opened. 

FEATURES INCLUDED:

  • Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.

THE COMPLETE RAMP PACKAGE:

An all-inclusive, stress-free option which we manage in-house.

This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 

Gallery

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

10 Menzies Road, Ponswood Industrial Estate, St Leonards on Sea, TN38 9BB

Hours:
8am - 5pm, Monday to Friday

Get In Touch