COVID-19 Testing Site, Accrington
ACCESSIBLE CABINS FOR LOCAL TESTING
Healthcare
Accrington, Hyndburn
PROJECT BACKGROUND & REQUIREMENT:
As part of the Government’s push to improve local COVID-19 testing access, a temporary facility was fast-tracked at Eastgate Car Park.
Fully DDA-compliant ramps and steps to the building were urgently required to be installed ahead of the site’s end-of-week launch.
Unlike traditional poured concrete or fixed timber solutions, which are single-use and labour-intensive to construct, our modular access systems offered quick and easy assembly, straightforward removal, and full reusability—providing the flexibility and efficiency required for temporary projects such as this.
DESIGN PHASE:
INSTALLATION:
- Looped Trombone Ends – Prevent clothing from snagging at handrail ends.
- Slip-resistant Mesh Platform - A multi-directional, self-draining walkway made from galvanised steel mesh.
- Anti-climbing Infill Handrail - Prevents climbing and reduces the risk of falls through open sections.
- Continuous Handrail - Offers uninterrupted support along the walkway.
- Standard Colour: Black - A powder-coated finish provides increased durability over conventional paint.
- Adjustable Telescopic Legs - Accommodate varying threshold heights with ease.
- Slip-Resistant Yellow Stair Nosings - Improve visibility of edges and level changes, especially for visually impaired users.
- Rest Platform – A rest platform at 5 metres to provide users with a place to pause.
- 1100mm High Rail – These Handrails installed on all level sections for safety and support.
- Continuous Handrail- A continuous handrail system that ensures users have uninterrupted support throughout use on the system.